UNDERESTIMATED - definition. What is UNDERESTIMATED
Diclib.com
قاموس ChatGPT
أدخل كلمة أو عبارة بأي لغة 👆
اللغة:

ترجمة وتحليل الكلمات عن طريق الذكاء الاصطناعي ChatGPT

في هذه الصفحة يمكنك الحصول على تحليل مفصل لكلمة أو عبارة باستخدام أفضل تقنيات الذكاء الاصطناعي المتوفرة اليوم:

  • كيف يتم استخدام الكلمة في اللغة
  • تردد الكلمة
  • ما إذا كانت الكلمة تستخدم في كثير من الأحيان في اللغة المنطوقة أو المكتوبة
  • خيارات الترجمة إلى الروسية أو الإسبانية، على التوالي
  • أمثلة على استخدام الكلمة (عدة عبارات مع الترجمة)
  • أصل الكلمة

%ما هو (من)٪ 1 - تعريف

UNEXPECTED INCURRED COSTS IN EXCESS OF BUDGETED AMOUNTS
Underestimate; Cost Overrun; Cost overun; Cost increase; Budget increase; Budget escalation; Cost overruns; Budget overrun; Over budget; Escalating costs; Escalating cost; Cost risk; Cost underestimation; Low balling; Cost increases; Underestimated; Cost under-estimation; Cost underestimations; Cost under-estimations

underestimate         
v. a.
Undervalue, underrate, misprize, rate below the true value, rate too low.
Underestimate         
·vt To set to/ low a value on; to estimate below the truth.
II. Underestimate ·noun The act of underestimating; too low an Estimate.
underestimate         
(underestimates, underestimating, underestimated)
1.
If you underestimate something, you do not realize how large or great it is or will be.
None of us should ever underestimate the degree of difficulty women face in career advancement...
Never underestimate what you can learn from a group of like-minded people.
VERB: V n, V wh
underestimation
...a serious underestimation of harm to the environment.
N-UNCOUNT: also a N
2.
If you underestimate someone, you do not realize what they are capable of doing.
The first lesson I learnt as a soldier was never to underestimate the enemy.
VERB: V n

ويكيبيديا

Cost overrun

A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms.

Cost overruns are common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.

Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.

Cost overrun is distinguished from cost escalation, which is an anticipated growth in a budgeted cost due to factors such as inflation.

أمثلة من مجموعة نصية لـ٪ 1
1. They underestimated Maliki‘s sophistication and cunning.
2. "The Iranians shouldn‘t be underestimated," said Thurtell.
3. Meanwhile, almost everyone underestimated oil demand.
4. However, their importance should not be underestimated.
5. The Conservatives claim it underestimated by 1.5bn.